
Park County, Colorado
Park County septic permits and inspection rules
What Park County, Colorado requires for onsite wastewater systems, and how we handle the paperwork for you.
Get Your Free Quote!
- Family Owned & Operated
- 20+ Years of Septic Experience
- Serving Denver & the Front Range
- Licensed & Insured
Licensing, experience, and credentials
- 20+ years in business
Who regulates septic systems in Park County
Park County Environmental Health
Park County septic rules, section by section
Permit requirements
Park County requires an OWTS permit for new installations, repairs, and expansions, with applications reviewed by Environmental Health. Mountain sites at elevation with shallow soils routinely need engineered designs, and processing runs longer during the May to September season. Confirm current contact details through the county site.
What triggers an inspection
The transfer-of-title inspection at property sale is the main trigger. Park County's short-term rental licensing also requires septic documentation, and an undocumented system must be permitted, inspected, and approved before an STR license is issued.
Transfer of title rules
Park County requires a transfer-of-title OWTS inspection and permit when most properties with septic systems sell. A NAWT-certified inspector uses the county's approved form covering the tank, soil treatment area, well distances, and maintenance status, and the county typically processes a complete application in 7 to 10 business days, longer in peak season.
- Plan one to two weeks minimum before closing
- Short-term rental licenses also require septic documentation under the county's 2026 STR rules
Required pumping frequency
Park County does not set a fixed pumping calendar; pump when scum and sludge approach a quarter of tank volume, which for seasonal cabins can stretch longer than the three-to-five-year norm and for full-time mountain homes matches it. Cold soils slow digestion, so do not defer a due pump-out into winter.
Setback rules
Park County enforces at least the Colorado Regulation 43 minimums: 100 feet from a well to the soil treatment area, 50 feet from a well to the tank, 50 feet from surface water and watercourses, 10 feet from property lines, and 5 feet from a dwelling to the tank. Streams, springs, and high groundwater in South Park make setback verification essential before any work.
Soil and percolation testing
Soil profile evaluation is required for new and replacement systems, and shallow decomposed granite over bedrock at elevation often fails conventional criteria, pushing designs to engineered or higher-treatment systems. Budget for the soil work up front, it decides everything else.
How we handle the paperwork
Most homeowners call us because a sale, a repair, or an inspection put a county form in front of them. We pump the tank, perform the inspection, complete the service and inspection records Park County asks for, and send copies to you, your agent, and the county. You are not left chasing forms. Call 720-427-7557 and tell us where you are in the process.
Which Park County communities do we serve?
These are the unincorporated communities and named areas inside Park County where onsite systems actually sit, on parcels that never got tied into a municipal sewer. The county is the permitting authority for all of them, so the guidance on this page is the guidance that governs the ground under each one.
- BaileyPumping, inspection, and repair for the Burland, Harris Park, and Will O' the Wisp subdivision country below Crow Hill.
- ShawneeCabin country septic along US 285 above Bailey, around Grant and the Guanella Pass turnoff.
Request service in Park County
Get Your Free Quote!
Septic help in Park County
Family owned, 20+ years on the Front Range. Call 720-427-7557 or request a free quote.
